[ Home ] [ Up ] [ UCEP Feedback Page ] [ Table of Contents ] [ SEARCH ]
|
Jan 99 |
Performance of the GTAC PV System for 1999This page contains measured performance data for the GTAC PV system for the year 1999.
* The "predicted" AC energy production for ** During October, failure of a cooling fan in the PCU
* The measured mean daylight-hours module temperatures are typically
* This "average" efficiency was found using only the times ** The inverter was disabled during November, due to fan failure.
* The inverter was disabled during November, due to fan failure. |